Four process flow of converter dust removal ash cold solidification pellets

key word:Direct reduction of iron, electric furnace, drying

Source: internal company

1.Material Preparation
◆Dust removal ash from the converter is transported to the raw material silo and unloaded pneumatically. It is then humidified, mixed, and sent to the digestion bin.
◆Starch dry powder adhesive is stored, chosen for its low Si content and good mixing performance.
◆Oxidized iron sheet is stored for future use.
2.Ingredient Compaction
◆The digested mixture, binder, and iron oxide scale are mixed in a double helix mixer and then sent to the wheel mill for backup.
◆In the wheel mill, materials are thoroughly mixed and compacted.
◆The compacted material is discharged and transported back to the ball roller's intermediate warehouse.



3.Ball Pressing and Sieving
◆The crushed mixture is fed into the ball compactor and pressed into balls. The balls and unformed powder are then transported to a screening station. The powder is recycled for further pressing, while the qualified balls proceed to the drying equipment.
4.Drying and Final Sieving
◆Raw balls are dried in a vertical drying bin and then quantitatively discharged for secondary screening. The screened material is either recycled or loaded for transportation.

The Development and Practical Role of Pure Hydrogen Metallurgy

Application of Direct Reduced Iron in Electric Furnaces

Roll skin wear of ball press machine

The impact of bentonite on pellet production in China

5 Factors Affecting Energy Consumption of Electric Arc Furnace Steelmaking



Where there is briquette, mixing, drying,
and system solution related,there is Kaizheng








Copyright@2024 Luoyang Kaizheng Environmental Protection Processing Equipment Co., Ltd